top of page

Careers

 2021  ~

Pre-feasibility study of military operability review for offshore wind farms in Korea

As part of the national energy transition policy, we conduct a feasibility study to determine whether the wind power generation project can be implemented, consultation and procedure analysis of military operability review at the national security level following the installation of offshore wind power generation facilities, identification of nearby military operational factors, investigation of radio wave effects, etc. (youngweul/yawoul/doowoori, younphyeng , ulsan GrayWhale)

부유발전기그림.png

 2021  ~

Pre-feasibility study of military operability review for onshore wind farms in Korea

Conducting military operability review consultation and procedure analysis according to the installation of onshore wind power generation facilities, identification of nearby military operational factors, investigation of radio wave effects, and feasibility study of wind power generation project (Yeongwol, Samdoongsan, Kowloon, Goseong)

42811_17868_2725.jpg

 2018

Coastal Surveillance Radar-Ⅱ Prior Research Investigation and Analysis

For the performance improvement project of the existing coast surveillance radar  Operational performance analysis and preparation of concrete plans, analysis of the possibility of fulfillment of the time of deployment, deduction of optimal acquisition plans through domestic and foreign level analysis, etc., calculation of total project cost, cost-effectiveness analysis, project implementation method, project management plan, etc. Basic business strategy Coastal Surveillance Radar-Ⅱ Prior Research Investigation and Analysis for Use in Establishment

해안감시레이더_GPS-98K_2.jpg

 2017

Investigation and analysis of prior research on the self-destruct UAV project

Efficient decision-making support for the implementation of the defense self-destruct UAV project, analysis of acquisition potential through research on domestic and foreign weapon system development trends and technology level, review of acquisition plans through cost analysis and cost-effectiveness analysis for each acquisition method, project implementation method, and project management Investigation and analysis of prior research on self-destruct UAV projects to establish basic business strategies such as measures 

 2017
 

Prior research on Korean precision coordinate measurement system project

In order to acquire the unique precision strike capability in preparation for the origin strike against the enemy target and the transfer of OPCON, the feasibility of operational operation performance for the establishment of the basic business strategy (draft), the feasibility of operational performance for the establishment of the basic business strategy (draft) for the efficient project implementation of the Korean precision coordinate measurement system project, the Analysis, derivation of the optimal acquisition plan, calculation of total project cost, cost-effectiveness analysis, etc.

 2017

ATCIS 2nd performance improvement project research

Appropriateness of cost due to required revision of ATCIS 2nd performance improvement project  Verification, adequacy of the extension of the operation period system project period and the adequacy of the request for an increase in the cost required for implementation

 2017

Prior research on multi-source image convergence system project

Establishment of system operation concept of multi-source video convergence system, identification of operational operation performance and requirements, identification of domestic and foreign technology holding level and technical risk factors, evaluation of technological maturity for core technology elements (CTE),  Prior research to establish a basic project strategy (draft) by deriving an optimal project implementation plan through total life cycle cost, budget required for each acquisition method, and cost-effectiveness analysis

 2016

Technological review of follow-up measures for the operation test and evaluation of the ballistic guided missile operational control system

Conducted technical review of company-led research and development, and technical review of military defects (follow-up measures for operation test and evaluation) of the ballistic missile operational control system

 2016

A study on the concept of measures to evaluate the impact of the weak military and to manage the results of measures

Dissemination of vulnerabilities in the defense information system, establishment of an integrated response system for the entire military, evaluation of the military impact of information system vulnerabilities, establishment of safety verification measures for security measures, and establishment of a frequent vulnerability inspection and verification environment

자폭형무인기운영개념.PNG
한국형정밀좌표측정체계.png
ATCIS 2차 성능개량.JPG
다출처영상융합체계.jpg
OV-1_KAMD-CELL_Korea.JPG
48138_26525_5643.jpg
bottom of page